PSPO I Exam Simulator 1
Test your Scrum framework knowledge
Scrum.org offers its Professional Scrum Product Owner Level 1 (PSPO I) certification which is widely known for being challenging to pass.
Test your Scrum framework knowledge now with our first free Exam PSPO I Simulator!
If you are also interested in Scrum Master certifications, you can learn more here: What Scrum Master Certification to Choose?
Note: Internet80 content is not affiliated in any way with Scrum.org.
We are always taking note on the feedback that we received, thank you.
Hispanoparlantes:
Versión en Español para ayudar en su preparación: Simulador para Examen PSPO I
If you are interested in PSM I certification, you can prove our PSM I Exam Simulator 1.
Quiz-summary
0 of 80 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
Information
Number of questions: 80
Time Limit: 60 minutes
Passing score: 85%
You can navigate through the questions whenever you want. The unanswered questions are marked in the navigation system. You can click the “review question” button to flag it for later review.
When you’re done answering the questions, click on the Quiz Summary button, then on Finish Quiz. You will see your score, and you can click on the View Questions button to receive feedback on all questions.
Click “Start quiz” when you are ready to begin.
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 80 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Average score |
|
Your score |
|
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- Answered
- Review
-
Question 1 of 80
1. Question
1 pointsMust the Product Owner be present at the Sprint Retrospective?
Correct
The Sprint Retrospective is an opportunity for the Scrum Team to inspect itself and create a plan for improvements to be enacted during the next Sprint.
Incorrect
The Sprint Retrospective is an opportunity for the Scrum Team to inspect itself and create a plan for improvements to be enacted during the next Sprint.
-
Question 2 of 80
2. Question
1 pointsThe Product Backlog items in the bottom of the Product Backlog are not as clear as those at the top. This is correct.
Correct
Since items in the bottom are no high priority because their lower business value, won’t be developed soon, therefore there’s no need to spend too much time adding nor clarifying detail to them; that would be some kind of upfront planning.
Incorrect
Since items in the bottom are no high priority because their lower business value, won’t be developed soon, therefore there’s no need to spend too much time adding nor clarifying detail to them; that would be some kind of upfront planning.
-
Question 3 of 80
3. Question
1 pointsA Product Owner is entitled to postpone the start of a new Sprint after the conclusion of a previous Sprint for the following reason:
Correct
A new Sprint starts immediately after the conclusion of the previous Sprint.
Incorrect
A new Sprint starts immediately after the conclusion of the previous Sprint.
-
Question 4 of 80
4. Question
1 pointsWhat two things should be done if the Product Owner is unavailable?
Correct
The Product Owner role is not a full-time job, and the amount of time requires depends on the project and its environment, however, they need to spend as much time as needed to do all their responsibilities, which are among others maximizing the value, setting priorities on Sprint Planning, answering questions during the Sprint and refactoring, helping developers adjust their work.
Incorrect
The Product Owner role is not a full-time job, and the amount of time requires depends on the project and its environment, however, they need to spend as much time as needed to do all their responsibilities, which are among others maximizing the value, setting priorities on Sprint Planning, answering questions during the Sprint and refactoring, helping developers adjust their work.
-
Question 5 of 80
5. Question
1 pointsLearning turns into ‘validated learning’ when assumptions and goals can be assessed through results. What is a key way for a Product Owner to apply validated learning?
Correct
The Product Owner manages Product Backlog against the assumption that value will be generated. This assumption remains invalidated when not checked against users and market.
Incorrect
The Product Owner manages Product Backlog against the assumption that value will be generated. This assumption remains invalidated when not checked against users and market.
-
Question 6 of 80
6. Question
1 pointsThe process of regular inspection and adaptation employs knowledgeable and skilled inspectors. What are two ways in which the Product Owner takes the lead in the inspection process?
Correct
Scrum users must frequently inspect Scrum artifacts and progress to detect undesirable variances. The primary tool for the Product Owner to uphold transparency is the Product Backlog. Product Backlog is a living artifact that is actively maintained and updated to reflect reality. At the Sprint Review, attendees collaborate on the next things that could be done to optimize value, which is processed into an updated Product Backlog.
Incorrect
Scrum users must frequently inspect Scrum artifacts and progress to detect undesirable variances. The primary tool for the Product Owner to uphold transparency is the Product Backlog. Product Backlog is a living artifact that is actively maintained and updated to reflect reality. At the Sprint Review, attendees collaborate on the next things that could be done to optimize value, which is processed into an updated Product Backlog.
-
Question 7 of 80
7. Question
1 pointsThe value delivered by a product can only be determined by revenue.
Correct
Value is likely to vary across products and organizations.
Incorrect
Value is likely to vary across products and organizations.
-
Question 8 of 80
8. Question
1 pointsWho creates the definition of “Done”?
Correct
If the definition of “Done” is part of the conventions, standards or guidelines of the development organization, all Scrum Teams must follow it as a minimum. The Development Team of the Scrum Team can complement it with elements specific for the product or context.
If “done” for an increment is not a convention of the development organization, the Development Team of the Scrum Team must define a definition of “done” appropriate for the product.Incorrect
If the definition of “Done” is part of the conventions, standards or guidelines of the development organization, all Scrum Teams must follow it as a minimum. The Development Team of the Scrum Team can complement it with elements specific for the product or context.
If “done” for an increment is not a convention of the development organization, the Development Team of the Scrum Team must define a definition of “done” appropriate for the product. -
Question 9 of 80
9. Question
1 pointsWhat two phrases best describe the relationship between the Product Owner and the Development Team.
Correct
The Product owner clearly expresses Product Backlog items, ensuring the Development Team understands items in the Product Backlog to the level needed for developing them and creating the value the Product Owner envisions. Scope may be re-negotiated if the effort grows much higher than anticipated.
Incorrect
The Product owner clearly expresses Product Backlog items, ensuring the Development Team understands items in the Product Backlog to the level needed for developing them and creating the value the Product Owner envisions. Scope may be re-negotiated if the effort grows much higher than anticipated.
-
Question 10 of 80
10. Question
1 pointsIn order to make investment decisions, the Product Owner is likely to look at the Total Cost of Ownership (TCO) of the product being built. What costs will a Product Owner take into account?
Correct
The owner of a product is not only accountable for the development and release of a product, but also the cost of maintaining and operating the product. If a person ‘owns’ the product, he/she can be expected to be responsible for the complete lifecycle of a product.
Incorrect
The owner of a product is not only accountable for the development and release of a product, but also the cost of maintaining and operating the product. If a person ‘owns’ the product, he/she can be expected to be responsible for the complete lifecycle of a product.
-
Question 11 of 80
11. Question
1 pointsA first Sprint can start before the Product Owner has a complete and exhaustive Product Backlog in place.
Correct
A first Sprint requires no more than a Product Owner, a team, and enough ideas to potentially complete a full Sprint.
Incorrect
A first Sprint requires no more than a Product Owner, a team, and enough ideas to potentially complete a full Sprint.
-
Question 12 of 80
12. Question
1 pointsHow important is it for a Product Owner to order Product Backlog items by value points?
Correct
Indications of value on Product Backlog are useful but are only a prediction until validated against users and market
Incorrect
Indications of value on Product Backlog are useful but are only a prediction until validated against users and market
-
Question 13 of 80
13. Question
1 pointsThe Sprint Review is the only time at which stakeholder feedback is taken into account.
Correct
A Product Owner engages actively and regularly with stakeholders. However, to limit the disturbance to the development progress and keep focus high, the stakeholders have a formal role in the process at the Sprint Review only.
Incorrect
A Product Owner engages actively and regularly with stakeholders. However, to limit the disturbance to the development progress and keep focus high, the stakeholders have a formal role in the process at the Sprint Review only.
-
Question 14 of 80
14. Question
1 pointsHow can a Product Owner use time-boxed Sprints to obtain feedback from users and the market?
Correct
The Product Owner manages Product Backlog against the assumption that value will be generated. This assumption remains invalidated when not checked against users and market. When a Sprint’s horizon is too long, you increase the risk that what is being developed may no longer be desired. Sprints limit risk to one calendar month or less of work.
Incorrect
The Product Owner manages Product Backlog against the assumption that value will be generated. This assumption remains invalidated when not checked against users and market. When a Sprint’s horizon is too long, you increase the risk that what is being developed may no longer be desired. Sprints limit risk to one calendar month or less of work.
-
Question 15 of 80
15. Question
1 pointsIt is mandatory for the Product Owner to monitor and share the progress of Product Backlog through:
Correct
Various projective practices upon trending have been used to forecast progress, like burn-downs, burn-ups, or cumulative flows. These have proven useful, but none are mandatory and care should be taken because none can replace the importance of empiricism. What will happen is unknown, no matter what has happened.
Incorrect
Various projective practices upon trending have been used to forecast progress, like burn-downs, burn-ups, or cumulative flows. These have proven useful, but none are mandatory and care should be taken because none can replace the importance of empiricism. What will happen is unknown, no matter what has happened.
-
Question 16 of 80
16. Question
1 pointsWhen can the Product Backlog be updated?
Correct
The Product Backlog is dynamic; it constantly changes to identify what the product needs in order to be appropriate, competitive, and useful. Product Backlog items can be updated at any time by the Product Owner or at the Product Owner’s discretion.
Incorrect
The Product Backlog is dynamic; it constantly changes to identify what the product needs in order to be appropriate, competitive, and useful. Product Backlog items can be updated at any time by the Product Owner or at the Product Owner’s discretion.
-
Question 17 of 80
17. Question
1 pointsWhat is the Product Owner accountable for in Scrum?
Correct
The Product Owner is responsible for maximizing the value of the product and the work of the Development Team. The primary tool to do so is the Product Backlog.
Incorrect
The Product Owner is responsible for maximizing the value of the product and the work of the Development Team. The primary tool to do so is the Product Backlog.
-
Question 18 of 80
18. Question
1 pointsThe Product Owner’s authority to change and update the Product Backlog is unlimited, except for:
Correct
For the Product Owner to succeed, the entire organization must respect his or her decisions. No one is allowed to tell the Development Team to work from a different set of requirements, and the Development Team isn’t allowed to act on what anyone else says.
Incorrect
For the Product Owner to succeed, the entire organization must respect his or her decisions. No one is allowed to tell the Development Team to work from a different set of requirements, and the Development Team isn’t allowed to act on what anyone else says.
-
Question 19 of 80
19. Question
1 pointsThe process of regular inspection and adaptation employs knowledgeable and skilled inspectors. What are two ways in which the Product Owner takes the lead in the inspection process?
Correct
Scrum users must frequently inspect Scrum artifacts and progress to detect undesirable variances. The primary tool for the Product Owner to uphold transparency is the Product Backlog. Product Backlog is a living artifact that is actively maintained and updated to reflect reality. At the Sprint Review, attendees collaborate on the next things that could be done to optimize value, which is processed into an updated Product Backlog.
Incorrect
Scrum users must frequently inspect Scrum artifacts and progress to detect undesirable variances. The primary tool for the Product Owner to uphold transparency is the Product Backlog. Product Backlog is a living artifact that is actively maintained and updated to reflect reality. At the Sprint Review, attendees collaborate on the next things that could be done to optimize value, which is processed into an updated Product Backlog.
-
Question 20 of 80
20. Question
1 pointsIf multiple teams are working on the same product, who should make sure that their outputs can be integrated into one Increment?
Correct
It’s up to the developers to find their way and ensure that their outputs will create an integrated Increment that is potentially releasable.
Incorrect
It’s up to the developers to find their way and ensure that their outputs will create an integrated Increment that is potentially releasable.
-
Question 21 of 80
21. Question
1 pointsTo what extent does technical debt limit the value a Product Owner can get from a product? Select two answers.
Correct
Technical debt is the consequence of poor system design and architecture, and/or related inconsistent processes. This is because the team doesn’t refactor, or have a poor definition of “Done”. If the technical debt keeps increasing, the development will become harder day after day, and it will slow down the progress on one hand, and even create problems for releases on the other hand.
The Development Team should apply continuous refactoring, and/or the whole Scrum Team must review issues with the definition of “Done” (standards not included on time, incomplete acceptance criteria, etc)Incorrect
Technical debt is the consequence of poor system design and architecture, and/or related inconsistent processes. This is because the team doesn’t refactor, or have a poor definition of “Done”. If the technical debt keeps increasing, the development will become harder day after day, and it will slow down the progress on one hand, and even create problems for releases on the other hand.
The Development Team should apply continuous refactoring, and/or the whole Scrum Team must review issues with the definition of “Done” (standards not included on time, incomplete acceptance criteria, etc) -
Question 22 of 80
22. Question
1 pointsWhat pre-conditions must be fulfilled in order to allow Sprint Planning to begin?
Correct
Sprint Planning serves to plan the work to be performed in the Sprint. This plan is created by the collaborative work of the entire Scrum Team. Sprint Planning is time-boxed to a maximum of eight hours for a one-month Sprint. What can be achieved in this time-box may be influenced by additional practices that are however not prescribed by Scrum.
Incorrect
Sprint Planning serves to plan the work to be performed in the Sprint. This plan is created by the collaborative work of the entire Scrum Team. Sprint Planning is time-boxed to a maximum of eight hours for a one-month Sprint. What can be achieved in this time-box may be influenced by additional practices that are however not prescribed by Scrum.
-
Question 23 of 80
23. Question
1 pointsHow does an organization know that a product built through Scrum is successful?
Correct
Scrum Teams deliver products iteratively and incrementally, maximizing opportunities for feedback. If a product isn’t released, the opportunity to capture user and market feedback is lost.
Incorrect
Scrum Teams deliver products iteratively and incrementally, maximizing opportunities for feedback. If a product isn’t released, the opportunity to capture user and market feedback is lost.
-
Question 24 of 80
24. Question
1 pointsThe Product Owner manages the Product Backlog. Who is accountable for estimating the effort to complete the Product Backlog items?
Correct
The Development Team is responsible for all estimates. The people who will perform the work make the final estimate.
Incorrect
The Development Team is responsible for all estimates. The people who will perform the work make the final estimate.
-
Question 25 of 80
25. Question
1 pointsWhat are two typical activities for a Product Owner in a Sprint?
Correct
The Product Owner represents the stakeholders to the Scrum Team. This typically requires active interaction in order to be able to represent stakeholders and their needs.
Product Backlog refinement is an ongoing process in which the Product Owner and the Development Team collaborate on the details of Product Backlog items.Incorrect
The Product Owner represents the stakeholders to the Scrum Team. This typically requires active interaction in order to be able to represent stakeholders and their needs.
Product Backlog refinement is an ongoing process in which the Product Owner and the Development Team collaborate on the details of Product Backlog items. -
Question 26 of 80
26. Question
1 pointsWhich description best fits the role of the Product Owner?
Correct
The Product Owner is responsible for maximizing the value of the product. How this is done will vary widely.
Incorrect
The Product Owner is responsible for maximizing the value of the product. How this is done will vary widely.
-
Question 27 of 80
27. Question
1 pointsWhat variables should a Product Owner consider when ordering the Product Backlog?
Correct
The Product Owner is responsible for ordering the items in the Product Backlog to best achieve goals and missions, thereby optimizing the value of the work the Development Team performs. How this is done, and what value means, may vary widely across organizations.
Incorrect
The Product Owner is responsible for ordering the items in the Product Backlog to best achieve goals and missions, thereby optimizing the value of the work the Development Team performs. How this is done, and what value means, may vary widely across organizations.
-
Question 28 of 80
28. Question
1 pointsWhat two things best help the Product Owner manage the value of a product?
Correct
The Product Owner manages the Product Backlog against the assumption that value will be generated. Indications of value on the Product Backlog are useful but are only a prediction until validated against users and the market.
Incorrect
The Product Owner manages the Product Backlog against the assumption that value will be generated. Indications of value on the Product Backlog are useful but are only a prediction until validated against users and the market.
-
Question 29 of 80
29. Question
1 pointsWhat best describes the relationship of the Product Owner and the stakeholders?
Correct
The Product Owner represents the stakeholders to the Scrum Team, which includes representing their desired requirements in the Product Backlog. The Product Owner has the final call over the Product Backlog.
Incorrect
The Product Owner represents the stakeholders to the Scrum Team, which includes representing their desired requirements in the Product Backlog. The Product Owner has the final call over the Product Backlog.
-
Question 30 of 80
30. Question
1 pointsWhich two statements explain why the definition of
Correct
All Scrum Team members must have a shared understanding of what it means for work to be complete, to ensure transparency. This is the definition of “Done” for the Scrum Team and is used to assess when work is complete on the product Increment. The Increment reviewed at the Sprint Review must be useable, so a Product Owner may choose to immediately release it.
Incorrect
All Scrum Team members must have a shared understanding of what it means for work to be complete, to ensure transparency. This is the definition of “Done” for the Scrum Team and is used to assess when work is complete on the product Increment. The Increment reviewed at the Sprint Review must be useable, so a Product Owner may choose to immediately release it.
-
Question 31 of 80
31. Question
1 pointsA Product Owner is essentially the same thing as a traditional Project Manager?
Correct
A traditional project manager is responsible for all aspects of a project; costs, resources, execution, release, planning, capacity. Scrum is a framework for complex product development, regardless of whether the work is organized in projects. The Product Owner is responsible for maximizing the value of the product and the work performed, a responsibility that is complemented by the specific accountabilities of the Development Team and the Scrum Master.
Incorrect
A traditional project manager is responsible for all aspects of a project; costs, resources, execution, release, planning, capacity. Scrum is a framework for complex product development, regardless of whether the work is organized in projects. The Product Owner is responsible for maximizing the value of the product and the work performed, a responsibility that is complemented by the specific accountabilities of the Development Team and the Scrum Master.
-
Question 32 of 80
32. Question
1 pointsWhat is a Product Backlog?
Correct
The Product Backlog is an ordered list of everything that might be needed in the product and is the single source of requirements for any changes to be made to the product. The Product Backlog evolves as the product and the environment in which it will be used evolves. Higher ordered Product Backlog items are usually clearer and more detailed than lower ordered ones. As long as a product exists, its Product Backlog also exists.
Incorrect
The Product Backlog is an ordered list of everything that might be needed in the product and is the single source of requirements for any changes to be made to the product. The Product Backlog evolves as the product and the environment in which it will be used evolves. Higher ordered Product Backlog items are usually clearer and more detailed than lower ordered ones. As long as a product exists, its Product Backlog also exists.
-
Question 33 of 80
33. Question
1 pointsCorrect The Product Owner manages the Product Backlog against the assumption that value will be generated. This assumption remains invalidated when not checked against users and the market.
Correct
The Product Owner manages the Product Backlog against the assumption that value will be generated. This assumption remains invalidated when not checked against users and the market.
Incorrect
The Product Owner manages the Product Backlog against the assumption that value will be generated. This assumption remains invalidated when not checked against users and the market.
-
Question 34 of 80
34. Question
1 pointsThe Development Team finds out during the Sprint that they aren’t likely to build everything they forecasted. What would you expect a Product Owner to do?
Correct
During the Sprint scope may be clarified and re-negotiated between the Product Owner and Development Team as more is learned.
Incorrect
During the Sprint scope may be clarified and re-negotiated between the Product Owner and Development Team as more is learned.
-
Question 35 of 80
35. Question
1 pointsWhat two things should be done if the Product Owner is unavailable?
Correct
The Scrum framework consists of Scrum Teams and their associated roles, events, artifacts, and rules. Each component within the framework serves a specific purpose and is essential to Scrum’s success and usage. The Scrum Team consists of a Product Owner, the Development Team, and a Scrum Master. The Product Owner is responsible for maximizing the value of the product and the work of the Development Team. In the absence of a Product Owner, the latter accountability is not performed.
Incorrect
The Scrum framework consists of Scrum Teams and their associated roles, events, artifacts, and rules. Each component within the framework serves a specific purpose and is essential to Scrum’s success and usage. The Scrum Team consists of a Product Owner, the Development Team, and a Scrum Master. The Product Owner is responsible for maximizing the value of the product and the work of the Development Team. In the absence of a Product Owner, the latter accountability is not performed.
-
Question 36 of 80
36. Question
1 pointsWhich three of the following are responsibilities of a self-organizing team?
Correct
It’s the responsibility of the Development Team to estimate the amount of work of Product Backlog items and to select the appropriate number of them for each Sprint. They also break down the items into tasks during the Sprint.
Measuring the project performance is the responsibility of the Product Owner while measuring the Sprint performance is done by the Development Team.
Creating new Product Backlog items, ordering them (prioritization), and making sure that everyone has a clear understanding of them is the responsibility of the Product Owner.Incorrect
It’s the responsibility of the Development Team to estimate the amount of work of Product Backlog items and to select the appropriate number of them for each Sprint. They also break down the items into tasks during the Sprint.
Measuring the project performance is the responsibility of the Product Owner while measuring the Sprint performance is done by the Development Team.
Creating new Product Backlog items, ordering them (prioritization), and making sure that everyone has a clear understanding of them is the responsibility of the Product Owner. -
Question 37 of 80
37. Question
1 pointsThe Product Owner wants to establish that value has been certainly delivered. Which two metrics should use?
Correct
Increased Velocity is desired, also is good to have visibility of our current Capacity but these metrics are not directly connected to value and can be misleading. WIP is a measure of how much work the team is doing at one time, it’s not used to measure value.
User/customer satisfaction is important. It’s not an abstract measure like lines of code or velocity.
There are several methods and some KPIs for measuring the value of the releases, and when improved, will show our success.Incorrect
Increased Velocity is desired, also is good to have visibility of our current Capacity but these metrics are not directly connected to value and can be misleading. WIP is a measure of how much work the team is doing at one time, it’s not used to measure value.
User/customer satisfaction is important. It’s not an abstract measure like lines of code or velocity.
There are several methods and some KPIs for measuring the value of the releases, and when improved, will show our success. -
Question 38 of 80
38. Question
1 pointsMore features will always result in more value.
Correct
The team having a lot of features to complete doesn’t guarantee that they include the most important ones.
Even more, having more features at the wrong moment may increase the maintenance cost and other efforts, which decreases the overall value.Incorrect
The team having a lot of features to complete doesn’t guarantee that they include the most important ones.
Even more, having more features at the wrong moment may increase the maintenance cost and other efforts, which decreases the overall value. -
Question 39 of 80
39. Question
1 pointsProduct Owner’s responsibility is described in the best way by this sentence
Correct
The Product Owner’s main purpose is accountability for maximizing the value of the product resulting from the work of the Scrum Team. How this is done may vary across organizations, Scrum Teams, and individuals.
Incorrect
The Product Owner’s main purpose is accountability for maximizing the value of the product resulting from the work of the Scrum Team. How this is done may vary across organizations, Scrum Teams, and individuals.
-
Question 40 of 80
40. Question
1 pointsWhat the Product Owner should do if s/she has doubts about the quality of the definition of “Done”?
Correct
The responsible for the Definition of Done is the Development Team rather than the Product Owner.
Incorrect
The responsible for the Definition of Done is the Development Team rather than the Product Owner.
-
Question 41 of 80
41. Question
1 pointsThe Product Owner thinks is better to delegate the estimation activities to the Development Team
Correct
Estimating is total responsibility of the Development Team by default. The Product Owner doesn’t choose to delegate it, because s/he hasn’t such authority in the first place.
Incorrect
Estimating is total responsibility of the Development Team by default. The Product Owner doesn’t choose to delegate it, because s/he hasn’t such authority in the first place.
-
Question 42 of 80
42. Question
1 pointsThe Development Team is ready to start the first Sprint, but the Product Backlog is not complete yet. What should the Product Owner do?
Correct
You don’t have to have all the items identified before starting the first Sprint since Product Backlog is a dynamic and live document. However, the chosen items as part of the current Sprint objective must be clear for development whatsoever.
Incorrect
You don’t have to have all the items identified before starting the first Sprint since Product Backlog is a dynamic and live document. However, the chosen items as part of the current Sprint objective must be clear for development whatsoever.
-
Question 43 of 80
43. Question
1 points43. The current Sprint was canceled, but some items are “Done”. What happens to these completed items?
Correct
When the Sprint is canceled, the Product Owner reviews the completed items and typically accepts those that are “Done”. This is so because there’s no added value in putting them back to the Product Backlog and then to another Sprint Backlog when there’s nothing left to do for them.
Whenever an item is not done during the Sprint (for cancellation or reaching the end of the timebox), it would be moved back to the Product Backlog, rather than the next Sprint Backlog. This is so, because the Product Owner might reorder them, and they won’t be on the top of the Product Backlog anymore.Incorrect
When the Sprint is canceled, the Product Owner reviews the completed items and typically accepts those that are “Done”. This is so because there’s no added value in putting them back to the Product Backlog and then to another Sprint Backlog when there’s nothing left to do for them.
Whenever an item is not done during the Sprint (for cancellation or reaching the end of the timebox), it would be moved back to the Product Backlog, rather than the next Sprint Backlog. This is so, because the Product Owner might reorder them, and they won’t be on the top of the Product Backlog anymore. -
Question 44 of 80
44. Question
1 pointsThe stakeholders should reorder the Product Backlog at the Sprint Review meeting.
Correct
Only the Product Owner can order the Product Backlog. This can be influenced by other stakeholders, but the Product Owner always has the final say.
Incorrect
Only the Product Owner can order the Product Backlog. This can be influenced by other stakeholders, but the Product Owner always has the final say.
-
Question 45 of 80
45. Question
1 pointsEach Sprint a product Increment must be released.
Correct
In order to provide value, the Increment must be usable, this is why an increment may be released only if makes sense.
Incorrect
In order to provide value, the Increment must be usable, this is why an increment may be released only if makes sense.
-
Question 46 of 80
46. Question
1 pointsBurndowcharts are not part of the Scrum framwork, however are very used because are a nice tool for tracking:
Correct
A burndown chart is a graphical representation of work left to do for a given period of time. When this tool is used by the Scrum Teams, is used to track the product development effort remaining in a Sprint.
Incorrect
A burndown chart is a graphical representation of work left to do for a given period of time. When this tool is used by the Scrum Teams, is used to track the product development effort remaining in a Sprint.
-
Question 47 of 80
47. Question
1 pointsChoose two important considerations when forming multiple cohesive Scrum teams is needed.
Correct
All teams should be cross-functional, with 10 or fewer members.
Incorrect
All teams should be cross-functional, with 10 or fewer members.
-
Question 48 of 80
48. Question
1 pointsWhat should the Product Owner do in the middle of the Sprint, when the Development Team realizes they are not able to finish all the Sprint Backlog items?
Correct
It is OK if some of the items are not done until the end of the Sprint. What we have in the Sprint Backlog is our best guess on what we can deliver. If there’s pressure on the developers to finish everything, they will start adding margins to their estimates, which turns into less productivity because of Parkinson’s law.
When the Development Team realizes they cannot finish everything, they get help from the Product Owner to adjust their work (tasks), to ensure they will deliver maximum value by the end of the Sprint.
The Product Backlog items in the Sprint Backlog are not added or removed during the Sprint.Incorrect
It is OK if some of the items are not done until the end of the Sprint. What we have in the Sprint Backlog is our best guess on what we can deliver. If there’s pressure on the developers to finish everything, they will start adding margins to their estimates, which turns into less productivity because of Parkinson’s law.
When the Development Team realizes they cannot finish everything, they get help from the Product Owner to adjust their work (tasks), to ensure they will deliver maximum value by the end of the Sprint.
The Product Backlog items in the Sprint Backlog are not added or removed during the Sprint. -
Question 49 of 80
49. Question
1 pointsIt is forecasted that the project will be over in 4 Sprints. The Product Owner wants to design acceptance tests for all items. What’s the best response from the Scrum Master?
Correct
Scrum doesn’t use upfront planning and design, and what is described in this question is a form of upfront preparation.
Incorrect
Scrum doesn’t use upfront planning and design, and what is described in this question is a form of upfront preparation.
-
Question 50 of 80
50. Question
1 pointsWhat happens to the Product Backlog when the end users’ environment and needs change in the middle of the project?
Correct
The Product Backlog is a dynamic concept, that is not completely composed at the beginning of the project (or any other time), and is never made static by baselining.
The Product Backlog always changes to reflect the feedback from the customer, end-users, market, and their environment.
It’s fair to say that the whole framework is designed in a way that enables such a responsive Product Backlog.Incorrect
The Product Backlog is a dynamic concept, that is not completely composed at the beginning of the project (or any other time), and is never made static by baselining.
The Product Backlog always changes to reflect the feedback from the customer, end-users, market, and their environment.
It’s fair to say that the whole framework is designed in a way that enables such a responsive Product Backlog. -
Question 51 of 80
51. Question
1 points51. Who should know the most about the progress toward a business objective?
Correct
The Product Owner is accountable for effective Product Backlog management and maximizing the value of the Scrum Teamwork, knowing and understanding which the needs of the business are.
Incorrect
The Product Owner is accountable for effective Product Backlog management and maximizing the value of the Scrum Teamwork, knowing and understanding which the needs of the business are.
-
Question 52 of 80
52. Question
1 points52. Which of the following is the best response from the Product Owner, when the developers have difficulty understanding the expectations in the middle of the Sprint?
Correct
The Product Owner is responsible for spending enough time with the developers to make sure the items are clear and understood.
The Daily Scrums are only for the developers. Others may attend, but they won’t participate.Incorrect
The Product Owner is responsible for spending enough time with the developers to make sure the items are clear and understood.
The Daily Scrums are only for the developers. Others may attend, but they won’t participate. -
Question 53 of 80
53. Question
1 points53. Talking about the purpose of the Definition of Done, choose the three best statements.
Correct
When a Product Backlog item or an Increment is described as “Done”, everyone must understand what “˜Done’ means. Scrum Team members must have a shared understanding of what it means for work to be complete, to ensure transparency and is used to assess when work is complete on the product Increment. This Definition of Done provides the team guidance on what it takes to make the increment shippable.
Incorrect
When a Product Backlog item or an Increment is described as “Done”, everyone must understand what “˜Done’ means. Scrum Team members must have a shared understanding of what it means for work to be complete, to ensure transparency and is used to assess when work is complete on the product Increment. This Definition of Done provides the team guidance on what it takes to make the increment shippable.
-
Question 54 of 80
54. Question
1 points54. A baselined Product Backlog is called:
Correct
“Baselining” is a term used in traditional environments for referring to a finalized upfront plan that would be followed in the future, and used for evaluating the actual performance. There’s no upfront planning and no baselines in Scrum.
Incorrect
“Baselining” is a term used in traditional environments for referring to a finalized upfront plan that would be followed in the future, and used for evaluating the actual performance. There’s no upfront planning and no baselines in Scrum.
-
Question 55 of 80
55. Question
1 points55. Who updates work remaining during the Sprint?
Correct
The Product Owner is responsible for measuring the progress of the project and tracking the remaining work in the Product Backlog.
The Development Team is responsible for measuring the progress of the Sprint and tracking the remaining work in the Sprint Backlog.Incorrect
The Product Owner is responsible for measuring the progress of the project and tracking the remaining work in the Product Backlog.
The Development Team is responsible for measuring the progress of the Sprint and tracking the remaining work in the Sprint Backlog. -
Question 56 of 80
56. Question
1 points56. The Product Owner can delegate some of his/her responsibilities to the Development Team.
Correct
The Product Owner can delegate his/her responsibilities to the development team, but s/he stays accountable.
Incorrect
The Product Owner can delegate his/her responsibilities to the development team, but s/he stays accountable.
-
Question 57 of 80
57. Question
1 points57. Multiple teams are working on the same product. Each team must have their own definition of “Done”.
Correct
All teams can use the same definition of “Done” but, if that makes sense, they can have different definitions as long as they are compatible and capable of creating integrated Increments. So, the teams don’t “must”, but they “may” have different definitions of Done.
Incorrect
All teams can use the same definition of “Done” but, if that makes sense, they can have different definitions as long as they are compatible and capable of creating integrated Increments. So, the teams don’t “must”, but they “may” have different definitions of Done.
-
Question 58 of 80
58. Question
1 points58. The Product Owner and Scrum Master should not be part of the Development Team.
Correct
The same person can play more than one role; e.g. Product Owner and developer. However, this is not recommended.
Incorrect
The same person can play more than one role; e.g. Product Owner and developer. However, this is not recommended.
-
Question 59 of 80
59. Question
1 points59. Who can change the Sprint Backlog during the Sprint?
Correct
The Product Backlog items in the Sprint Backlog do not change, but another element in the Sprint Backlog is the tasks, and they are always changing.
This is the responsibility of the Development Team to make changes in the Sprint Backlog tasks; while they may also “consult” the Product Owner for this.Incorrect
The Product Backlog items in the Sprint Backlog do not change, but another element in the Sprint Backlog is the tasks, and they are always changing.
This is the responsibility of the Development Team to make changes in the Sprint Backlog tasks; while they may also “consult” the Product Owner for this. -
Question 60 of 80
60. Question
1 points60. What percentage of the Product Owner’s time should be dedicated to the team?
Correct
Product Owner is not a full-time job, and the amount of time required depends on the project and its environment. They need to spend as much time as needed to do all their responsibilities, which results in maximizing the value.
Note that the only reason for the Product Owner to spend time with the developers is not refinement, but also Sprint Planning, answering questions during the Sprint, helping developers adjust their work, etc.Incorrect
Product Owner is not a full-time job, and the amount of time required depends on the project and its environment. They need to spend as much time as needed to do all their responsibilities, which results in maximizing the value.
Note that the only reason for the Product Owner to spend time with the developers is not refinement, but also Sprint Planning, answering questions during the Sprint, helping developers adjust their work, etc. -
Question 61 of 80
61. Question
1 pointsHardening Sprints are helpful for defect management and integration.
Correct
There are no hardening Sprints in Scrum. All Sprints are the same and create Increments. Activities dedicated to stabilizing the code base or “Hardening” is done during all Sprints.
Incorrect
There are no hardening Sprints in Scrum. All Sprints are the same and create Increments. Activities dedicated to stabilizing the code base or “Hardening” is done during all Sprints.
-
Question 62 of 80
62. Question
1 pointsConflict must be avoided at all cost on Agile teams.
Correct
Managed conflicts can be helpful to the project. Through proper conflict management, team members learn more about the project goals, project details, create or improve ideas and interact with each other in a productive way.
Incorrect
Managed conflicts can be helpful to the project. Through proper conflict management, team members learn more about the project goals, project details, create or improve ideas and interact with each other in a productive way.
-
Question 63 of 80
63. Question
1 pointsFor the Product Owner, is important to be aware of technical debt, why?
Correct
Technical debt is shortcomings in the code that makes it less than “good enough”, and therefore creates risks in the future. It usually decreases velocity in the future (because the team has to fix the shortcomings), and as some of the debt might remain in the final product, the maintenance cost will increase as well.
The total cost of ownership is a combination of the project cost and maintenance cost.Incorrect
Technical debt is shortcomings in the code that makes it less than “good enough”, and therefore creates risks in the future. It usually decreases velocity in the future (because the team has to fix the shortcomings), and as some of the debt might remain in the final product, the maintenance cost will increase as well.
The total cost of ownership is a combination of the project cost and maintenance cost. -
Question 64 of 80
64. Question
1 pointsHow long the Sprint Planning takes in a project with three-week Sprints?
Correct
Sprint Planning is timeboxed to a maximum of 8 hours for a one-month Sprint. For shorter Sprints, the event is usually shorter.
Incorrect
Sprint Planning is timeboxed to a maximum of 8 hours for a one-month Sprint. For shorter Sprints, the event is usually shorter.
-
Question 65 of 80
65. Question
1 pointsAre the best two scenarios which represent a self-organizing Development.
Correct
A self-organized team is a team that is able to self-manage and decide how best to accomplish their work.
Incorrect
A self-organized team is a team that is able to self-manage and decide how best to accomplish their work.
-
Question 66 of 80
66. Question
1 pointsWho is part of the Scrum Team?
Correct
This is an easy question. But be careful, it has multiple answers, a question might seem easy but you can choose wrong or in an incomplete way, just because you didn’t read it carefully.
Incorrect
This is an easy question. But be careful, it has multiple answers, a question might seem easy but you can choose wrong or in an incomplete way, just because you didn’t read it carefully.
-
Question 67 of 80
67. Question
1 pointsPick 3 activities that can be the responsibilities of the Product Owner.
Correct
Designing the software is part of the development and should be done by the developers. They are self-organized and make technical decisions, and volunteer for tasks (assign them to themselves). Estimation is the responsibility of the developers, because they are the people who will develop the item. The rest are done by the Product Owner.
Incorrect
Designing the software is part of the development and should be done by the developers. They are self-organized and make technical decisions, and volunteer for tasks (assign them to themselves). Estimation is the responsibility of the developers, because they are the people who will develop the item. The rest are done by the Product Owner.
-
Question 68 of 80
68. Question
1 pointsYou are a Product Owner for multiple products. Each product is allocated a dedicated Scrum Team and a set budget. Based on the average velocity of a previous product release, You had estimated a new product to take 10 Sprints to complete. The average velocity of the previous product release was 40 completed story points per Sprint. Over the first 3 Sprints, the Development Team reported an average velocity of 30 completed story points per Sprint, while not fully completing the required QA tests. The Development Team estimates that integration testing would require additional effort to make the increments shippable. The Development Team is unsure if the required velocity is achievable. What is the most effective way to recover?
Correct
At the end of every Sprint, an increment of “Done” work must be available in order to inspect and adapt properly.
Scrum is based on empirical process control and asserts that knowledge comes from previous experience and making decisions based on what is already known. Scrum employs an iterative, incremental approach to optimize predictability and control risk.Incorrect
At the end of every Sprint, an increment of “Done” work must be available in order to inspect and adapt properly.
Scrum is based on empirical process control and asserts that knowledge comes from previous experience and making decisions based on what is already known. Scrum employs an iterative, incremental approach to optimize predictability and control risk. -
Question 69 of 80
69. Question
1 pointsSince the Product Owner is in charge of business goals, s/he alos is responsible for preparing the Sprint Goal before the Sprint Planning.
Correct
The Product Owner is in charge of setting the overall vision for the product and ensuring that it aligns with business goals. However, the Sprint Goal is prepared during the Sprint Planning, by the whole Scrum Team.
Incorrect
The Product Owner is in charge of setting the overall vision for the product and ensuring that it aligns with business goals. However, the Sprint Goal is prepared during the Sprint Planning, by the whole Scrum Team.
-
Question 70 of 80
70. Question
1 pointsThe Product Owner is responsible for the definition of “Done”.
Correct
Sometimes organizations can use a definition of “Done” for all projects. Otherwise, the Development Team would be responsible for creating one.
Even when there’s a definition of “Done” in the organization, it can be used as a minimum, and the developer can add extra elements to it.Incorrect
Sometimes organizations can use a definition of “Done” for all projects. Otherwise, the Development Team would be responsible for creating one.
Even when there’s a definition of “Done” in the organization, it can be used as a minimum, and the developer can add extra elements to it. -
Question 71 of 80
71. Question
1 pointsWhich two statements are correct about Sprint Retrospective meeting?
Correct
The Sprint Retrospective is the last event in the Sprint. It is timeboxed to a maximum of one-month Sprint, and all Scrum Team members attend it.
Its purpose is looking for improvements in the individuals, interactions, processes, tools, and their Definition of Done (the way the Scrum Team is working), problems faced, etc.Incorrect
The Sprint Retrospective is the last event in the Sprint. It is timeboxed to a maximum of one-month Sprint, and all Scrum Team members attend it.
Its purpose is looking for improvements in the individuals, interactions, processes, tools, and their Definition of Done (the way the Scrum Team is working), problems faced, etc. -
Question 72 of 80
72. Question
1 pointsThe Product Owner can delegate some of his/her responsibilities to the Development Team.
Correct
The Product Owner can delegate his/her responsibilities to the development team, but s/he stays accountable.
Incorrect
The Product Owner can delegate his/her responsibilities to the development team, but s/he stays accountable.
-
Question 73 of 80
73. Question
1 pointsThe Development Team’s velocity was 250 units of work at the end of the 4th Sprint. It has become 275 at the end of the 6th Sprint. Therefore, the team is creating more value now, compared to the past.
Correct
Velocity and value are not related directly. Value is the benefit to cost ratio. Since we start with the most important items first, those
remained for the 6th Sprint are expected to have less value compared to those delivered at the 4th Sprint.Incorrect
Velocity and value are not related directly. Value is the benefit to cost ratio. Since we start with the most important items first, those
remained for the 6th Sprint are expected to have less value compared to those delivered at the 4th Sprint. -
Question 74 of 80
74. Question
1 pointsWhich statement is correct when the developers are working in the middle of the Sprint?
Correct
During the Sprint, the Product Backlog items in the Sprint Backlog would not be added or removed, but as more is learned, the scope may be clarified and re-negotiated between the Product Owner and Development Team. This is mainly focused on the interpretation of the Product Backlog items and the tasks created by decomposing them.
Incorrect
During the Sprint, the Product Backlog items in the Sprint Backlog would not be added or removed, but as more is learned, the scope may be clarified and re-negotiated between the Product Owner and Development Team. This is mainly focused on the interpretation of the Product Backlog items and the tasks created by decomposing them.
-
Question 75 of 80
75. Question
1 pointsIn order to start the first Sprint, Scrum only requires a Product Owner…
Correct
In complex domains, you are only able to know the outcomes in hindsight. Empiricism, from which Scrum was founded, asserts that knowledge comes from experience and making decisions based on what is known. New knowledge will emerge as work is being done.
Incorrect
In complex domains, you are only able to know the outcomes in hindsight. Empiricism, from which Scrum was founded, asserts that knowledge comes from experience and making decisions based on what is known. New knowledge will emerge as work is being done.
-
Question 76 of 80
76. Question
1 pointsIt’s up to the Development Team to decide which Scrum events are needed during the Sprint.
Correct
All Scrum events are necessary; they should never be removed.
Incorrect
All Scrum events are necessary; they should never be removed.
-
Question 77 of 80
77. Question
1 pointsWhat does the “Cone of Uncertainty” tell us about Scrum projects?
Correct
The “cone of uncertainty” is about the fact that uncertainty is highest at the beginning of the project, and reduced as we progress. This uncertainty can be about the duration, requirements, etc.
The “cone of uncertainty” is no part of the scrum framework, but is another tool/technique that can be used.Incorrect
The “cone of uncertainty” is about the fact that uncertainty is highest at the beginning of the project, and reduced as we progress. This uncertainty can be about the duration, requirements, etc.
The “cone of uncertainty” is no part of the scrum framework, but is another tool/technique that can be used. -
Question 78 of 80
78. Question
1 pointsThe Product Owner can ask the developers to order the Product Backlog items instead of him/her.
Correct
The Product Owner can delegate his/her responsibilities to the development team, but s/he stays accountable.
Incorrect
The Product Owner can delegate his/her responsibilities to the development team, but s/he stays accountable.
-
Question 79 of 80
79. Question
1 pointsThe Product Backlog refinement shouldn’t take more than 10% of the Product Owner’s time.
Correct
The Product Backlog refinement is done by the Product Owner and the Development Team. The common practice (not a rule) is that it shouldn’t take more than 10% of the developers’ time. The Product Owner spends as much time as required on refinement.
Incorrect
The Product Backlog refinement is done by the Product Owner and the Development Team. The common practice (not a rule) is that it shouldn’t take more than 10% of the developers’ time. The Product Owner spends as much time as required on refinement.
-
Question 80 of 80
80. Question
1 pointsYou as Product Owner are using burn-up charts instead of burn-down charts. What is wrong about it?
Correct
Burn-down charts are very common for tracking and representing progress, but they are not mandatory, and the Product Owner can use other tools/techniques as well.
Incorrect
Burn-down charts are very common for tracking and representing progress, but they are not mandatory, and the Product Owner can use other tools/techniques as well.